Nova Day production and quality review

Quality management

Quality starts with the details

Retail display quality management defines functional, dimensional and appearance checks before production, then connects them to material, process and shipment records.

What we care about

Quality, timing and budget start with clear checks

Agree the acceptance criteria early, plan the inspection stages and resolve fit or function questions before committing to a production run.

On quality

Approve measurable dimensions, appearance and function.

On time

Identify material, tooling and inspection gates before production.

On budget

Reduce rework by confirming the sample and acceptance points early.

Test methods

Match the test to the application

Select checks for the actual product and operating environment. Define the sample, method and acceptance criteria before testing; not every product needs the same test plan.

01

Falling-ball impact

Define the sample, drop height and acceptance condition.

02

Resistance test

Check material or surface resistance required by the use case.

03

Flexural strength

Review bending behaviour for rails, dividers and structural parts.

04

Movement test

Cycle pushers, rollers or sliding products under the expected load.

Incoming control

Measure material before production

Material identity, dimensions, color and storage condition should be checked before the batch enters the production route.

  • Material reference
  • Color and transparency
  • Critical input dimensions
  • Batch identification

Profile sample: review material, colour and critical dimensions.

In-process inspection

Check while the product is being made

First-article approval and planned in-process checks catch variation before it becomes a completed shipment.

  • First production piece
  • Tool and machine settings
  • Critical dimensions
  • Assembly and movement

Production equipment: connect process settings to agreed checks.

Team quality process

One approved result, shared across departments

Engineering, production, inspection and packing work from the same approved sample and project checklist.

01

Requirement

Define what affects installation and use.

02

Sample

Approve form, fit, movement and finish.

03

Production

Monitor the agreed control points.

04

Shipment

Verify quantity, packing and final records.

Request a project-specific inspection plan

Share the product drawing or sample, intended use and critical acceptance criteria. We can review which checks belong in your inspection plan.